Thursday, April 15, 2010

Delivery Day

No, its not what you think. Even though Baby Pasta showed signs of coming early, he has changed his mind and is now comfortably camped out in my belly having a great time.


But we did have another exciting delivery on our street...


A HOUSE THAT WAS PUT UP IN THREE HOURS.

Here is the site before 7:30 this morning.

 Here is what happened between 7:30 and 8:05.
Yes, those are kitchen cabinets.  
The dishwasher and microwave are already installed as well.
At 8:05 the first floor was in place and we just had to wait for the trucks to bring in the second floor.

While we waited for the next section to arrive, we got some visitors.  Parker and Bayden both stopped by to watch the crane lift the second floor into place.

The second floor comes with the roof attached.  All they had to do was pop up the roof and nail in the supports.  The triangles hanging on the side of the building popped right into place and completed the job.  It was like building with Lincoln Logs.  10:30 and the job was done!  I dropped Noah and Ben off at school after the trucks pulled out and now the guys are cleaning up and finishing up the shingles and siding.

If you have to have a house built across the street, this is the way to go. 

Anyone looking for a 4 brm, 2 1/2 bath house on a quiet street???